Project:
Ministry of Social Development Building Terrace Floors, Trinidad
Completed:
2016
Client:
Kee Chanona Limited
System:
Pre-cast Concrete Pavers and Pedestal Floor System installed over Carlisle Mira-Drain Drainage and Protection Board over CCW 500 R 215 Mil Reinforced Hot Rubberised Asphalt System fully adhered to sloping concrete deck. This project was completed on time, within budget and to the satisfaction of our client.
A fifteen (15) year WSCL System Warranty was issued to ensure the waterproofing ability of the materials and workmanship employed.